• Selected Works
  • On the Drawing Board
  • Services
  • Contact Us
Menu

KArchi Architects

Johannesburg
KArchi /kär(k)i/
082 822 1998
KArchi Architects

Your Custom Text Here

KArchi Architects

  • Selected Works
  • On the Drawing Board
  • Services
  • Contact Us
  Feasibility and Design Study:  Site Plan and Parking Layout

Commercial Services

- Feasibility and Design Studies

- Sketch Design:

o   Conceptual development through to sketch designs. Presented in both 2D (plans sections & elevations) and 3D format.

o   Adherence to the properties zoning rights, title deed restrictions and town planning restrictions.

o   Adherence to, and interpretation of any design rules and guidelines as they pertain to residential estates.

o   Drawing sets for high level costing purposes. (Specifically relevant during Due Diligence periods)- Consulting rate of R1750/hr

- Marketing Material

- Site Development Plans (SDP)

- Municipal Submissions/ Drawings for Construction:

o   Production of detailed drawing sets for submission to the local authorities.

o   Adherence to all SANS 204 Building Regulations and Codes as well as Energy Efficiency Regulations contained in the SANS 10400 XA Documentation.

o   Submission of the required supporting documentation and relevant forms.

o   Production of full detailed drawing sets, including details for construction purposes.

- Site Supervision:

o   Ensuring that the builder’s adhere to the drawings delivered to site.

o   Quality control.

- Project Management:

o   Role of Principle Agent.

Commercial Services

- Feasibility and Design Studies

- Sketch Design:

o   Conceptual development through to sketch designs. Presented in both 2D (plans sections & elevations) and 3D format.

o   Adherence to the properties zoning rights, title deed restrictions and town planning restrictions.

o   Adherence to, and interpretation of any design rules and guidelines as they pertain to residential estates.

o   Drawing sets for high level costing purposes. (Specifically relevant during Due Diligence periods)- Consulting rate of R1750/hr

- Marketing Material

- Site Development Plans (SDP)

- Municipal Submissions/ Drawings for Construction:

o   Production of detailed drawing sets for submission to the local authorities.

o   Adherence to all SANS 204 Building Regulations and Codes as well as Energy Efficiency Regulations contained in the SANS 10400 XA Documentation.

o   Submission of the required supporting documentation and relevant forms.

o   Production of full detailed drawing sets, including details for construction purposes.

- Site Supervision:

o   Ensuring that the builder’s adhere to the drawings delivered to site.

o   Quality control.

- Project Management:

o   Role of Principle Agent.

  Feasibility and Design Study:  Site Plan and Parking Layout

Feasibility and Design Study: Site Plan and Parking Layout

  Feasibility and Design Study:  Block Layout

Feasibility and Design Study: Block Layout

  Sketch Design:  Site Plan & Unit Schedule

Sketch Design: Site Plan & Unit Schedule

  Sketch Design:  Plan

Sketch Design: Plan

  Sketch Design:  Conceptual Perspectives

Sketch Design: Conceptual Perspectives

  Marketing Material:  Site Layout

Marketing Material: Site Layout

  Marketing Material:  Ground Floor Layout

Marketing Material: Ground Floor Layout

  Marketing Material:  First Floor Layout

Marketing Material: First Floor Layout

  Marketing Material:  Unit Layout

Marketing Material: Unit Layout

  SDP 01 & 02

SDP 01 & 02

  SDP 03 & 04

SDP 03 & 04

  Municipal/ Construction Drawings:  Site Plan

Municipal/ Construction Drawings: Site Plan

  Municipal/ Construction Drawings:  Ground Floor Plan

Municipal/ Construction Drawings: Ground Floor Plan

  Municipal/ Construction Drawings:  Typical 1st, 2nd & 3rd Floor Plans

Municipal/ Construction Drawings: Typical 1st, 2nd & 3rd Floor Plans

  Municipal/ Construction Drawings:  Sections

Municipal/ Construction Drawings: Sections

  Municipal/ Construction Drawings:  Elevations 1

Municipal/ Construction Drawings: Elevations 1

  Municipal/ Construction Drawings:  Elevations 2

Municipal/ Construction Drawings: Elevations 2

  Municipal/ Construction Drawings:  Door and Window Schedules

Municipal/ Construction Drawings: Door and Window Schedules

  Construction Drawings:  Guard House Details

Construction Drawings: Guard House Details

  Municipal/ Construction Drawings:  Boundary Walls and Refuse Details

Municipal/ Construction Drawings: Boundary Walls and Refuse Details

  Construction Drawings:  Steel Clip-On Structure Details

Construction Drawings: Steel Clip-On Structure Details

  Construction Drawings:  Fire Escape Details

Construction Drawings: Fire Escape Details

  Construction Drawings:  Detailed Unit Layouts

Construction Drawings: Detailed Unit Layouts

  Construction Drawings:  Details

Construction Drawings: Details

KArchi Architects Copyright 2019